Friday, September 20, 2019

Huge Traffic Meltdown on Walnut Thanks to UPRR

A UPRR freight train broke down sometime around 2:30 blocking Walnut Avenue and maybe Stevenson, but I couldn't tell for sure.  The train had a broken air hose some 75 cars back, which probably would have taken it south of Stevenson.  The northbound train began rolling around 3:20, but in the meantime traffic was in gridlock between Walnut and Mowry, and Overacker and Cherry as commuters and those getting an early start on the weekend, were stuck.

1 comment:

  1. That’s what it was. I could see on my cameras the cars were stopped and I thought it was from the construction. Man I’m glad I was still at work.

    ReplyDelete